|
|
 |
| |
|
 |
 |
| |
SAF - East Boldre Wastewater Treatment Works
|
|
 |
|
 |
| |

Tighter effluent constraints under AMP3
Solution to comply with Southern Waters design Standard DST235
SAF units and final tanks manufactured in stainless steel
| Current Status: |
Installed January 2005 |
| Client: |
Black & Veatch Costain JV |
| Population Served: |
600 |
| Consent |
20:30:5 BOD:SS:Ammonia |
| Contract Value: |
£ 270,000 |
| Brief Description: |
Design, supply, installation & commissioning
of a complete new packaged sewage treatment plant |
Project Need:
To upgrade the existing Sewage Treatment Works to meet the tighter effluent consent according to Southern Waters design Standard DST235.
Description of Works;
Tighter final effluent constraints to be imposed under AMP3 meant that the sewage treatment works serving the village of East Boldre was in need upgrading. Black and Veatch Costain JV, being the main contractor, approached Copa Limited to supply SAF units that when combined with the existing filters would achieve the new consent. The whole schem would also need to complied with Southern Waters design Standard DST235.
Copa designed, supplied, installed and commissioned a complete new packaged sewage treatment plant consisting of 3 No GRP Septic tanks, 4 No. new biological treatment units and two GRP walk-in kiosks, one housing two control panels and one housing 6 No. 5.5 kW side channel air blowers. The package works was designed with ease of operation in mind and a long, maintenance free, service life has been ensured by manufacturing the SAF units and final tanks in stainless steel.
Key Elements;
Outline and Detailed Design and Cost Estimates.
Supply of 3 GRP 2 stage septic tanks.
Supply and installation of 4 stainless steel CB750 above ground Copa SAF units.
Supply and installation of two GRP walk-in kiosks housing 6 blowers and one housing two control panels.
Electrical Site Cabling.
Site Testing.
Commissioning.
Operation and Maintenance manuals.
Staff Training.
|
|
|
|
|