SAF - Fordcombe Wastewater Treatment Works
|
|
 |
|
 |
| |

• Tighter effluent constraints under AMP3
• Solution to comply with Southern Water’s design Standard DST235
• SAF units and final tanks manufactured in stainless steel
| Current Status: |
Installed December 2003 |
| Client: |
Morrison Brown and Root |
| Population Served: |
375 |
| Consent |
30:40:6 BOD:SS:Ammonia |
| Contract Value: |
£ 185,000 |
| Brief Description: |
Design, supply, installation & commissioning
of a complete new packaged sewage treatment plant |
Project Need:
To upgrade the existing Sewage Treatment Works to meet the tighter effluent consent according to Southern Water’s design Standard DST235.
Description of Works;
Tighter final effluent constraints to be imposed under AMP3 meant that the sewage treatment works serving the village of Fordcombe was in need of replacement. Morrison Brown & Root, being the main contractor, approached Copa Limited to put forward a solution that complied with Southern Waters design Standard DST235.
Copa designed, supplied, installed and commissioned a complete new packaged sewage treatment plant consisting of 2 No GRP Septic tanks, 2 No biological treatment units, 2 No cross flow final settlement tanks and a GRP walk-in kiosk housing an MCC control panel and 3 No. 5.5 kW side channel air blowers. The package works was designed with ease of operation in mind and a long, maintenance free, service life has been ensured by manufacturing the SAF units and final tanks in stainless steel.
Key Elements;
• Outline and Detailed Design and Cost Estimates
• Supply of 2 GRP 2 stage septic tanks
• Supply and installation of 2 stainless steel CB750 above ground Copa SAF units
• Supply and installation of a GRP walk-in kiosk housing blowers and an MCC control panel.
• Supply and installation of 3 new stainless steel 4m dia, cross flow, final settlement tanks with automatic desludging valves.
• Electrical Site Cabling, testing, commissioning, O&Mmanuals and Staff Training.
|
|
|
|
|