  SAF - Linton Wastewater Treatment Works  
  Printer Version
 


Current Status: Installed January 2003
Client: Morrison Brown and Root
Population Served: 400
Consent 20:30:10 BOD:SS:Ammonia
Contract Value: £ 185,000
Brief Description: Design, supply, installation & commissioning of a complete new packaged sewage treatment plant


Project Need:

To upgrade the existing Sewage Treatment Works to meet the tighter effluent consent according to Southern Water’s design Standard DST235.

Description of Works;

Tighter final effluent constraints to be imposed under AMP3 meant that the sewage treatment works serving Linton was in need of replacement. Morrison Brown & Root, being the main contractor, approached Copa Limited to put forward a solution that complied with Southern Waters design Standard DST235.

Copa designed, supplied, installed and commissioned a complete new packaged sewage treatment plant consisting of 2 No GRP Septic tanks, 2 No biological treatment units, 3 No cross flow final settlement tanks and a GRP walk-in kiosk housing an MCC control panel and 3 No. 5.5 kW side channel air blowers. The package works was designed with ease of operation in mind and a long, maintenance free, service life has been ensured by manufacturing the SAF units and final tanks in stainless steel.

Key Elements;

• Outline and Detailed Design and Cost Estimates
• Supply of 2 new GRP 2 stage septic tanks
• Supply and installation of 2 new stainless steel CB750 above ground Copa SAF units
• Supply and installation of a new GRP walk-in kiosk housing an MCC control panel and 3 no 5.5 kW blowers
• Supply and installation of 3 new stainless steel 4m dia, cross flow, final settlement tanks with automatic desludging valves.
• Supply and installation of flow splitting chamber and interconnecting pipework.
• Electrical Site Cabling.
• Testing and commissioning of new installation.
• Operation and Maintenance manuals and Staff Training.