SAF - Poynings East Wastewater Treatment Works
|
|
 |
|
 |
| |

Tighter effluent constraints under AMP3
Solution to comply with Southern Waters design Standard DST235
SAF units and final tanks manufactured in stainless steel
| Current Status: |
Installed October 2004 |
| Client: |
Black and Veatch Costain JV |
| Population Served: |
250 |
| Consent |
15:25 BOD:SS |
| Contract Value: |
£ 62,000 |
| Brief Description: |
Design, supply, installation & commissioning
of a complete new packaged sewage treatment plant |
Project Need:
To upgrade the existing Sewage Treatment Works to meet the tighter effluent consent according to Southern Waters design Standard DST235.
Description of Works;
Tighter final effluent constraints to be imposed under AMP3 meant that the sewage treatment works serving the village of Poynings was in need of replacement. Black and Veatch Costain JV, being the main contractor, approached Copa Limited to put forward a solution that complied with Southern Waters design Standard DST235.
Copa designed, supplied, installed and commissioned a complete new packaged sewage treatment plant consisting of a GRP storm tank, a GRP septic tank, a new biological treatment unit and a GRP walk-in kiosk housing an MCC control panel and 2 No. 4 kW side channel air blowers. The package works was designed with ease of operation in mind and a long, maintenance free, service life has been ensured by manufacturing the SAF units and final tanks in stainless steel.
Key Elements:
Outline and Detailed Design and Cost Estimates.
Supply of GRP storm tank.
Supply of GRP 2 stage septic tank.
Supply and installation of 1 stainless steel CB400 above ground Copa SAF unit.
Supply and installation of a GRP walk-in kiosk housing blowers and an MCC control panel.
Electrical Site Cabling.
Site Testing.
Commissioning.
Operation and Maintenance manuals.
Staff Training.
|
|
|
|
|