  Distributors - Glazebury Wastewater Treatment Works  
  Printer Version
 



• Design of rectangular bed filter distributors
• Supply only of 16 No. Rotating Distributors

Current Status

Installed 2004

Client

T J Brent

Location

Davyhulme, Manchester

Brief Description

Filter Distributor Modifications

Contract Value

£ 115,000





Description of Works:

The existing rectangular bed filter distributors had syphonic feeds, which when broken meant losing a quarter of the treatment capacity. The scheme therefore involved replacing the existing distributors with 16 rotating distributors to allow a greater degree of flexibility and easier management of plant maintenance. The works had to be carried out whilst maintaining 87.5% bed capacity, allowing installation of two circular distributors at any one time. In order to accommodate the circular distributors, fabricated centre wells had to be mounted on the dividing wall, whilst retaining structural integrity.


Key Elements

• Structural Survey of Existing Dividing Wall (by T J Brent)
• Complete M&E Design (by T J Brent)
• Distributor design by Copa
• Project Management (by T J Brent)
• Supply only of 16No. Rotating Distributors
• Stainless steel centre wells, drive units, control panels (by T J Brent)
• Supply and Installation of Electro-Pneumatic Distributor Drive Units
• Supply and Installation of Local Control Panels (by T J Brent)
• Integration of New Controls into Existing System (by T J Brent)
• Supply and Installation of 450m Handrail and Access Steps (by T J Brent)